South Island Roofing

Roof replacement cost in Greater Victoria

As of late 2026, a new asphalt architectural shingle roof on a typical Greater Victoria house runs about $7,000 to $22,500 before GST. Steel standing seam runs about $17,500 to $55,500, and steel metal shingle about $17,500 to $40,000. Roof area, the layers we strip and the wood under them decide where your roof lands.

Close view of asphalt roof shingles with frost on the surface
Written quotes,
priced line by line

Roof replacement cost Victoria BC

These are ranges built from published 2026 price guides, not quotes. We applied each source's installed price per square foot to the roof area of two common South Island houses and kept the full spread. Every figure assumes one layer torn off, a sound deck and normal access, before GST.

The roof areas are our arithmetic. The bungalow sits on a 30 by 50 ft footprint; eaves of 12 to 24 inches add 11 to 22 percent, and a 4/12 to 8/12 slope adds 5 to 20 percent more (the slope factor is the square root of 1 plus rise over run, squared). The two-storey stacks its 2,500 sq ft on a 25 by 50 ft footprint, so it carries less roof than the smaller bungalow. Low ends pair the smallest roof with the cheapest rate and high ends the largest with the dearest, which is why the bands are wide.

The sources disagree, and the gap is useful. Victoria's Forge Metal Roofing publishes metal at $12 to $20 and up a square foot; two national guides put steel standing seam at $18 to $25. Forge lists corrugated metal at $8 to $14, so a metal quote under about $15 a square foot deserves one question: concealed-fastener standing seam, or exposed-fastener panel screwed through the face? None of the Victoria guides we read prices metal shingle separately, so that row is Canadian data.

Installed roof replacement ranges, Greater Victoria, as of late 2026 (before GST)
MaterialInstalled price per sq ft of roof1,500 sq ft bungalow (about 1,750 to 2,200 sq ft of roof)2,500 sq ft two-storey (about 1,480 to 1,880 sq ft of roof)Where the price band comes from
Asphalt architectural shingle$5 to $10$8,500 to $22,500$7,000 to $19,000Forge Metal Roofing Victoria guide, $5 to $9 (2026); Green Building Canada, $6 to $10 for architectural (2026)
Metal standing seam (steel)$12 to $25$21,000 to $55,500$17,500 to $47,500Forge Metal Roofing Victoria guide, $12 to $20+ (2026); Green Building Canada and RenoQuotes, $18 to $25 (2026)
Metal shingle (steel)$12 to $18$21,000 to $40,000$17,500 to $34,000Green Building Canada, $12 to $18 (2026); no Victoria guide breaks this out

Near salt water, aluminum standing seam runs $22 to $30 a square foot installed (Green Building Canada, 2026). For what each material buys you over its life, read metal vs asphalt roofing.

What drives the price of a new roof?

Material sets the band. Seven things inside the job decide where in it your roof lands, and several only show once the old roof is off.

  • Roof squares. A square is 100 sq ft of roof surface, and most quotes are built per square. Floor area is a poor guide, as the bungalow in the table shows.
  • Pitch and access. Steep roofs are slower. WorkSafeBC requires fall protection wherever a worker could fall 3 m (10 ft) or more, so on a two-storey the anchors or guardrails go up before a shingle comes off.
  • Layers and cedar shake tear-off. Every extra layer is more labour and more tonnes. The Cedar Shake and Shingle Bureau allows shakes on spaced boards with gaps between them; asphalt and metal need a continuous deck, so a shake roof on spaced boards gets new plywood or OSB throughout. On our bungalow that is 55 to 69 sheets: at RenoQuotes' 2026 figure of $75 to $130 a sheet, roughly $4,100 to $9,000 on top of the table.
  • Sheathing replacement. Sheathing is the plywood or board deck the roof is nailed to. Rot only shows after tear-off, so the fair way to price it is a cost per sheet, written down before work starts.
  • Ventilation. Attic vents let warm, damp air out. The City of Victoria's climate data lists about 800 mm of rain a year, and a poorly vented attic holds moisture against the new deck. RenoQuotes puts a roof vent at $250 to $500 a unit in 2026.
  • Flashing and chimneys. Flashing is the bent metal that seals the joints where the roof meets a chimney, wall or skylight; drip edge is the metal strip along the roof's edges. New metal costs more than reusing old pieces or leaning on caulk, so ask which the quote assumes.
  • Disposal. The CRD's Hartland landfill charges $110 a tonne for asphalt or wood shingles, and both must arrive separated from other waste. At Malarkey's 242 lb per square for a new laminated shingle, one layer off our bungalow is roughly 2 to 2.5 tonnes, about $210 to $270 in tipping fees (a rough estimate; old shingles, felt and nails weigh differently). A disposal line far above that is mostly bin rental, trucking and labour.

Older houses face one more local rule. The CRD lists multi-layer roofing and roofing felt as suspected asbestos materials, and Hartland wants lab results or proof of a post-1990 build before taking them. WorkSafeBC says pre-1990 homes likely contain asbestos somewhere, so a two-layer roof on an older house can add testing before tear-off.

Why do quotes for the same roof vary so much?

Two quotes for the same roof can sit thousands of dollars apart without either roofer being dishonest. They are usually pricing different jobs: different layers, sheathing allowances, flashing and metal profiles, plus three lines homeowners rarely notice.

  • Eave protection. Ice and water shield is a self-sticking rubberized membrane laid along the eaves and in valleys. The national model code lets builders skip it where ice dams are unlikely, and Victoria's winters are mild: the City's climate bulletin lists 2,700 heating degree-days and a January design temperature of minus 4°C. One roofer treats the membrane as standard; another leaves it out.
  • Underlayment. This is the sheet layer between the deck and the shingles. Synthetic and felt products sit at different prices, so the product name belongs in writing.
  • High-wind nailing. IKO's Cambridge shingle carries a 177 km/h wind warranty as standard and 210 km/h only with the maker's high-wind application; Malarkey's Highlander reads 177 and 209 km/h. The extra nails and starter pieces cost little, and leaving them out stays invisible until a winter storm.

The low quote is often the one that left a line out and adds it later as a change order. Sometimes that is optimism about the deck rather than bad faith. It is still your money.

Ranges are a starting point. For your roof's real number, ask for a written, itemized quote.

Get a written quote

How to compare two roofing quotes line by line

Put the quotes side by side and fill in this table for each. A blank cell is a question to ask before you sign, not a reason to pick the lower total.

What each line of a roof replacement quote should state
LineWhat the quote should stateWhy it matters
Roof areaSquares measured, and the pitchDivide the price by squares and you compare like with like
Tear-offNumber of layers, and cedar or asphaltEach layer is labour plus tonnes at Hartland
SheathingPrice per sheet for rot, or a full new deck on a shake roofRot stays hidden until the old roof is off
Underlayment and eavesProduct name, and ice and water shield at eaves and valleys, yes or noCode may not require the membrane here, so quotes differ
Shingle or panelBrand, product line and colour; for metal, the profile, gauge and fastener typeExposed screws and thin steel cost less for a reason
Wind ratingThe maker's high-wind application, yes or noDecides which wind warranty tier applies
Flashing and drip edgeNew metal at chimney, walls and skylightsTells you whether old metal stays on the roof
VentilationNumber and type of intake and exhaust ventsA damp attic works against the new deck
Disposal and testingSeparated loads, and who handles asbestos testing on a pre-1990 houseCRD rules apply to every tear-off
WarrantyManufacturer warranty tier and workmanship terms, in writingAsk any roofer for both documents

Victoria BC roof replacement permit

Neither the City of Victoria nor the District of Saanich publishes a rule saying a re-roof is exempt from a building permit. Confirm with your municipality before work starts, and keep the answer in writing.

In the City of Victoria, Building and Plumbing Regulation Bylaw 17-113 requires a permit before 'constructing, demolishing, repairing, changing the use of, or altering a building', and its exemptions do not mention roofing. The City's building permit page points to its Permit Finder and permit staff for this question. Heritage-designated houses cannot have their appearance or materials altered without Council approval, so a switch from cedar to asphalt, or asphalt to metal, starts there.

In Saanich, Building Bylaw 9529 also requires a permit to repair or alter a building, then exempts 'minor repairs or alterations to non-structural components'. Shingles are not structure; rafters are. Whether new sheathing or a whole re-roof counts as minor is Saanich's call. Start at the Saanich Inspection Services page and its permit Q&A.

Expect a permit question whenever the job goes past the covering: new rafters, a changed roof shape or added weight. Oak Bay, Esquimalt, Langford, Colwood and Sidney write their own bylaws, and each page under service areas links that municipality's building department.

From a range to a written quote

A range tells you whether the job fits your budget. A written quote needs the roof measured, the layers counted and the deck checked. Send your municipality, the roof's age and what you have noticed through the quote form, and we reply within one business day.

If the roof may only need fixing, start with roof repair; for a full job, roof replacement and metal roofing explain how we work. Flat or torch-on sections, such as a carport or a low addition, are outside what we do.

Roof cost questions

How much does a new roof cost in Victoria BC in 2026?

As of late 2026, published price guides put asphalt architectural shingle at about $5 to $10 a square foot of roof installed and steel standing seam at about $12 to $25. On a 1,500 sq ft bungalow that works out to about $8,500 to $22,500 for asphalt and $21,000 to $55,500 for standing seam, before GST. Extra layers, rotten sheathing and cedar shake tear-off add to those numbers.

Does a two-storey house cost more to re-roof than a bungalow?

Not always. A 2,500 sq ft two-storey on a 25 by 50 ft footprint carries roughly 1,480 to 1,880 sq ft of roof, less than the 1,750 to 2,200 sq ft over a 1,500 sq ft bungalow. The two-storey does need fall protection and more staging, which pushes its price per square foot up, so compare quotes per square rather than by house size.

Does the price include removing the old roof?

Most published per-square-foot rates assume one layer torn off, but RenoQuotes lists removal separately at $2 to $4 a square foot on metal jobs. Ask each roofer to write down how many layers they priced. A second layer or cedar shakes on spaced boards changes the job, and on a pre-1990 house the CRD wants asbestos test results before Hartland takes multi-layer roofing.

What does it cost to replace a cedar shake roof?

Price the new material from the table, then add a new deck. Shakes often sit on spaced boards, and asphalt or metal need a continuous surface, so most shake roofs get plywood or OSB over the whole roof. On 1,750 to 2,200 sq ft of roof that is 55 to 69 sheets, roughly $4,100 to $9,000 at RenoQuotes' 2026 per-sheet figure. Hartland charges $110 a tonne for the old wood shingles.

Do I need a permit to replace my roof in Victoria or Saanich?

Possibly. Victoria's building bylaw requires a permit to repair or alter a building and does not exempt roofing by name. Saanich exempts minor repairs and alterations to non-structural parts and decides what counts as minor. Heritage-designated houses in Victoria need Council approval to change roof materials. Confirm with your municipality before work starts and keep the reply in writing.

Why is one roofing quote so much lower than another?

Usually because it prices a smaller job. Compare the lines: layers torn off, sheathing per sheet, ice and water shield at the eaves, high-wind nailing, new or reused flashing, vents and disposal. A quote that says nothing about sheathing or flashing is not cheaper, only unfinished. The line-by-line table on this page lists what each quote should state.

Should I choose metal or asphalt for a Victoria house?

It turns on shade, salt exposure and how long you will own the house. Metal costs roughly two to two and a half times as much up front and lasts longer, while asphalt recovers more of its cost at sale. We install both, and our metal vs asphalt roofing guide works through the trade with sourced lifespans and a cost-per-year comparison.

Sources

Figures are dated ranges from these sources, not quotes. Checked November 2026.

  1. Forge Metal Roofing: What does a new roof cost in Victoria BC? (2026 pricing guide)
  2. Shoreline Roofing: New roof cost in Victoria BC, 2026
  3. Green Building Canada: Comparing metal roof vs shingle roof costs
  4. RenoQuotes: Roof replacement cost in Canada 2026
  5. RenoQuotes: Metal roof cost per square foot in Canada in 2026
  6. Capital Regional District: Hartland Landfill rates and accepted items
  7. Capital Regional District: Reno and demo waste
  8. Capital Regional District: Hartland wood and asphalt shingles factsheet
  9. WorkSafeBC: Have your home tested for asbestos before reno, demo, or maintenance work
  10. WorkSafeBC: OHS Regulation Part 11, Fall protection
  11. Cedar Shake and Shingle Bureau: General design and application details
  12. West Fraser: Asphalt shingles over cedar shakes, good idea or bad move?
  13. Malarkey Roofing Products: Highlander technical data sheet (RCABC Roofing Practices Manual)
  14. IKO: Cambridge shingles brochure, Canada
  15. City of Victoria: Climatic and seismic data information bulletin (March 2025)
  16. National Research Council Canada: Intent of NBC Sentence 9.26.5.1.(2), eave protection exemptions
  17. RCABC Roofing Practices Manual: Eave protection
  18. City of Victoria: Building permits
  19. City of Victoria: Building and Plumbing Regulation Bylaw No. 17-113 (consolidated)
  20. City of Victoria: Heritage conservation
  21. District of Saanich: Inspection Services, building permits
  22. District of Saanich: Building Bylaw, 2019, No. 9529 (consolidated)
  23. District of Saanich: Permit Q&As

Want a written quote for your roof?

Tell us about the roof and where the house is. We reply within one business day, and nothing is booked until you say so.

Request a written quote
Get a written roofing quote