Roof replacement cost Victoria BC
These are ranges built from published 2026 price guides, not quotes. We applied each source's installed price per square foot to the roof area of two common South Island houses and kept the full spread. Every figure assumes one layer torn off, a sound deck and normal access, before GST.
The roof areas are our arithmetic. The bungalow sits on a 30 by 50 ft footprint; eaves of 12 to 24 inches add 11 to 22 percent, and a 4/12 to 8/12 slope adds 5 to 20 percent more (the slope factor is the square root of 1 plus rise over run, squared). The two-storey stacks its 2,500 sq ft on a 25 by 50 ft footprint, so it carries less roof than the smaller bungalow. Low ends pair the smallest roof with the cheapest rate and high ends the largest with the dearest, which is why the bands are wide.
The sources disagree, and the gap is useful. Victoria's Forge Metal Roofing publishes metal at $12 to $20 and up a square foot; two national guides put steel standing seam at $18 to $25. Forge lists corrugated metal at $8 to $14, so a metal quote under about $15 a square foot deserves one question: concealed-fastener standing seam, or exposed-fastener panel screwed through the face? None of the Victoria guides we read prices metal shingle separately, so that row is Canadian data.
| Material | Installed price per sq ft of roof | 1,500 sq ft bungalow (about 1,750 to 2,200 sq ft of roof) | 2,500 sq ft two-storey (about 1,480 to 1,880 sq ft of roof) | Where the price band comes from |
|---|---|---|---|---|
| Asphalt architectural shingle | $5 to $10 | $8,500 to $22,500 | $7,000 to $19,000 | Forge Metal Roofing Victoria guide, $5 to $9 (2026); Green Building Canada, $6 to $10 for architectural (2026) |
| Metal standing seam (steel) | $12 to $25 | $21,000 to $55,500 | $17,500 to $47,500 | Forge Metal Roofing Victoria guide, $12 to $20+ (2026); Green Building Canada and RenoQuotes, $18 to $25 (2026) |
| Metal shingle (steel) | $12 to $18 | $21,000 to $40,000 | $17,500 to $34,000 | Green Building Canada, $12 to $18 (2026); no Victoria guide breaks this out |
Near salt water, aluminum standing seam runs $22 to $30 a square foot installed (Green Building Canada, 2026). For what each material buys you over its life, read metal vs asphalt roofing.
What drives the price of a new roof?
Material sets the band. Seven things inside the job decide where in it your roof lands, and several only show once the old roof is off.
- Roof squares. A square is 100 sq ft of roof surface, and most quotes are built per square. Floor area is a poor guide, as the bungalow in the table shows.
- Pitch and access. Steep roofs are slower. WorkSafeBC requires fall protection wherever a worker could fall 3 m (10 ft) or more, so on a two-storey the anchors or guardrails go up before a shingle comes off.
- Layers and cedar shake tear-off. Every extra layer is more labour and more tonnes. The Cedar Shake and Shingle Bureau allows shakes on spaced boards with gaps between them; asphalt and metal need a continuous deck, so a shake roof on spaced boards gets new plywood or OSB throughout. On our bungalow that is 55 to 69 sheets: at RenoQuotes' 2026 figure of $75 to $130 a sheet, roughly $4,100 to $9,000 on top of the table.
- Sheathing replacement. Sheathing is the plywood or board deck the roof is nailed to. Rot only shows after tear-off, so the fair way to price it is a cost per sheet, written down before work starts.
- Ventilation. Attic vents let warm, damp air out. The City of Victoria's climate data lists about 800 mm of rain a year, and a poorly vented attic holds moisture against the new deck. RenoQuotes puts a roof vent at $250 to $500 a unit in 2026.
- Flashing and chimneys. Flashing is the bent metal that seals the joints where the roof meets a chimney, wall or skylight; drip edge is the metal strip along the roof's edges. New metal costs more than reusing old pieces or leaning on caulk, so ask which the quote assumes.
- Disposal. The CRD's Hartland landfill charges $110 a tonne for asphalt or wood shingles, and both must arrive separated from other waste. At Malarkey's 242 lb per square for a new laminated shingle, one layer off our bungalow is roughly 2 to 2.5 tonnes, about $210 to $270 in tipping fees (a rough estimate; old shingles, felt and nails weigh differently). A disposal line far above that is mostly bin rental, trucking and labour.
Older houses face one more local rule. The CRD lists multi-layer roofing and roofing felt as suspected asbestos materials, and Hartland wants lab results or proof of a post-1990 build before taking them. WorkSafeBC says pre-1990 homes likely contain asbestos somewhere, so a two-layer roof on an older house can add testing before tear-off.
Why do quotes for the same roof vary so much?
Two quotes for the same roof can sit thousands of dollars apart without either roofer being dishonest. They are usually pricing different jobs: different layers, sheathing allowances, flashing and metal profiles, plus three lines homeowners rarely notice.
- Eave protection. Ice and water shield is a self-sticking rubberized membrane laid along the eaves and in valleys. The national model code lets builders skip it where ice dams are unlikely, and Victoria's winters are mild: the City's climate bulletin lists 2,700 heating degree-days and a January design temperature of minus 4°C. One roofer treats the membrane as standard; another leaves it out.
- Underlayment. This is the sheet layer between the deck and the shingles. Synthetic and felt products sit at different prices, so the product name belongs in writing.
- High-wind nailing. IKO's Cambridge shingle carries a 177 km/h wind warranty as standard and 210 km/h only with the maker's high-wind application; Malarkey's Highlander reads 177 and 209 km/h. The extra nails and starter pieces cost little, and leaving them out stays invisible until a winter storm.
The low quote is often the one that left a line out and adds it later as a change order. Sometimes that is optimism about the deck rather than bad faith. It is still your money.
Ranges are a starting point. For your roof's real number, ask for a written, itemized quote.
Get a written quoteHow to compare two roofing quotes line by line
Put the quotes side by side and fill in this table for each. A blank cell is a question to ask before you sign, not a reason to pick the lower total.
| Line | What the quote should state | Why it matters |
|---|---|---|
| Roof area | Squares measured, and the pitch | Divide the price by squares and you compare like with like |
| Tear-off | Number of layers, and cedar or asphalt | Each layer is labour plus tonnes at Hartland |
| Sheathing | Price per sheet for rot, or a full new deck on a shake roof | Rot stays hidden until the old roof is off |
| Underlayment and eaves | Product name, and ice and water shield at eaves and valleys, yes or no | Code may not require the membrane here, so quotes differ |
| Shingle or panel | Brand, product line and colour; for metal, the profile, gauge and fastener type | Exposed screws and thin steel cost less for a reason |
| Wind rating | The maker's high-wind application, yes or no | Decides which wind warranty tier applies |
| Flashing and drip edge | New metal at chimney, walls and skylights | Tells you whether old metal stays on the roof |
| Ventilation | Number and type of intake and exhaust vents | A damp attic works against the new deck |
| Disposal and testing | Separated loads, and who handles asbestos testing on a pre-1990 house | CRD rules apply to every tear-off |
| Warranty | Manufacturer warranty tier and workmanship terms, in writing | Ask any roofer for both documents |
Victoria BC roof replacement permit
Neither the City of Victoria nor the District of Saanich publishes a rule saying a re-roof is exempt from a building permit. Confirm with your municipality before work starts, and keep the answer in writing.
In the City of Victoria, Building and Plumbing Regulation Bylaw 17-113 requires a permit before 'constructing, demolishing, repairing, changing the use of, or altering a building', and its exemptions do not mention roofing. The City's building permit page points to its Permit Finder and permit staff for this question. Heritage-designated houses cannot have their appearance or materials altered without Council approval, so a switch from cedar to asphalt, or asphalt to metal, starts there.
In Saanich, Building Bylaw 9529 also requires a permit to repair or alter a building, then exempts 'minor repairs or alterations to non-structural components'. Shingles are not structure; rafters are. Whether new sheathing or a whole re-roof counts as minor is Saanich's call. Start at the Saanich Inspection Services page and its permit Q&A.
Expect a permit question whenever the job goes past the covering: new rafters, a changed roof shape or added weight. Oak Bay, Esquimalt, Langford, Colwood and Sidney write their own bylaws, and each page under service areas links that municipality's building department.
From a range to a written quote
A range tells you whether the job fits your budget. A written quote needs the roof measured, the layers counted and the deck checked. Send your municipality, the roof's age and what you have noticed through the quote form, and we reply within one business day.
If the roof may only need fixing, start with roof repair; for a full job, roof replacement and metal roofing explain how we work. Flat or torch-on sections, such as a carport or a low addition, are outside what we do.

