South Island Roofing

Greater Victoria roofing, quoted line by line

We replace asphalt roofs, fix leaks and install metal roofs on South Island homes. Before we sell you anything, we explain what we saw, what it should cost and whether a repair would do. Every quote is written and itemized, and we reply within one business day.

Get a written quote

Written quotes, priced line by line

A reply within one business day

Timber house with a dark shingle roof among evergreen trees under a clear sky

Houses from Sidney to Colwood, Oak Bay to Langford

See service areas

A roofing crew that
explains before it quotes

South Island Roofing is a residential roofing crew working across Greater Victoria. We do three jobs: asphalt shingle replacement, roof and leak repair, and metal roofing. We do them on houses. Flat torch-on roofs, commercial buildings and strata complexes are outside what we do, and we say so up front instead of stretching to fit.

Every quote we send is written and broken out line by line: tear-off, disposal, underlayment (the waterproof layer under the shingles), flashing (the metal that seals chimneys and walls), ventilation, the shingle or panel product, and a set price per sheet for any rotten roof boards we uncover. If a repair will keep your roof dry for several more winters, the quote says that before it mentions a new roof. You decide with the full picture in front of you.

How we work
Two-storey house with a dark asphalt shingle roof and a covered porch
Old roof covered in moss under tall trees

Built for wet, windy, mossy South Island winters

Environment Canada's 1981 to 2010 normals put Victoria International Airport at 883 mm of precipitation a year, almost 80 percent of it between October and March, with about 150 days of measurable rain and only 8 with snow. Metchosin's station averages about 1,040 mm. So we spend our care where water lingers: eaves, valleys, chimney and wall flashing, and shaded slopes where moss holds rain against the shingles.

Rainwater running off the edge of a roofWeathered cedar shake roof with two dormer windows

How to choose the best roofing company in Victoria BC

We won't rank ourselves. This is the checklist we'd hand a friend collecting roof quotes in Greater Victoria, whoever they hire. A good roofer answers all six in writing without being chased.

Get the full scope in writing

A one-line price tells you almost nothing. Ask for tear-off, disposal, underlayment, flashing, ventilation and the exact shingle or panel product as separate lines, so two quotes can be compared item by item instead of by the total.

Ask: tear-off or overlay?

Laying new shingles over old ones costs less up front and buries the roof boards where nobody can check them. A tear-off lets the crew see soft or rotten wood and fix it. Ask which one is planned, and why.

Ask what happens in the attic

Ask how the attic is vented and whether anyone will look inside. A 2015 RDH Building Engineering field study found Pacific Northwest roof boards getting wet enough for mould even when vented, so more vents alone is not a complete answer.

Permits, heritage and WorkSafeBC

Re-roofing rules differ by municipality, and heritage-designated homes need extra approval. Ask who confirms the permit. Ask any roofer for proof of WorkSafeBC coverage and insurance, and you can request a WorkSafeBC clearance letter yourself.

Know what the price leaves out

Ask whether the disposal bin, new flashing, drip edge (the metal strip along the roof edge), ridge vents and cleanup are included. Ask which manufacturer warranty applies and who registers it. Missing lines tend to come back as extras.

Ask how rot gets priced

Nobody sees the roof boards until the old roof is off. A fair quote names a price per sheet of replacement sheathing (the plywood roof deck) before work starts, and the crew shows you the damage, with photos, before replacing any of it.

How a job runs, start to finish

Four steps, whether it's one leaking vent or a full metal roof. You know the scope and the price before anyone leans a ladder on your house.

Craftsman-style house with a grey shingle roof, porch and front garden
01

Send the quote form

Tell us your municipality, the roof's age, what you've noticed and which service you're asking about. Photos taken from the ground or indoors help, especially of ceiling stains. We reply within one business day to set a time to look.

Where we work on the South Island

Victoria, Saanich, Oak Bay, Esquimalt, View Royal, Langford, Colwood, Metchosin, Sooke, Central Saanich, North Saanich and Sidney. If your house is in one of these municipalities, the quote form covers you.

We roof houses in the City of Victoria too. For the rest of the region, see all service areas.

Roofing questions from Greater Victoria homeowners

Straight answers on cost, repair or replace, and materials. For prices in detail, read the roof replacement cost guide or metal vs asphalt.

How much does a new roof cost in Greater Victoria?

As of late 2026, two Victoria roofers' published pricing guides put a full replacement at $9,000 to $30,000 (Shoreline Roofing, June 2026) and $12,000 to $40,000 or more (Forge Metal Roofing, 2026), with asphalt at $5 to $9 per square foot installed. Roof size, pitch, extra layers to tear off and rotten boards move the number. Our cost guide breaks it down, and your written quote is the real figure.

Should I repair my roof or replace it?

Repair when the damage is in one place and the rest of the roof is sound: a cracked vent seal, a strip of wind-lifted shingles, tired flashing at a chimney. Replace when shingles are curling or shedding granules across whole slopes, leaks keep returning in new spots, or the roof is near the end of its life. We tell you which one we'd choose, and why, on the written quote.

Is metal or asphalt better for a Victoria roof?

Asphalt costs less up front. Metal runs roughly 1.5 to 2 times the price, going by 2026 Victoria figures from Forge Metal Roofing and Shoreline Roofing, and InterNACHI's life-expectancy chart gives it 40 to 80 years against 20 to 30 for asphalt. Metal sheds rain and moss better; asphalt is cheaper to patch. If you plan to stay 25 years or more, price both. See metal vs asphalt.

How long does a roof replacement take?

For asphalt on a typical detached house, plan on one to three working days on site. Standing seam metal (long panels joined by raised seams) usually takes three to seven, plus a couple of weeks for made-to-order panels, according to Forge Metal Roofing's timeline guide. Rain, a steep pitch, a second layer of old shingles and rotten boards all add days. Your quote gives a schedule for your roof.

Can we stay home while the roof is replaced?

Yes. The work is outside and the roof is closed up at the end of every day. Expect hammering and a bin in the driveway. Move cars out, take fragile things off the walls of top-floor rooms, and cover anything stored in the attic, because dust and grit drop through during tear-off. Keep pets and kids well clear of the work area.

Can asphalt or metal go over an old cedar shake roof?

We don't do it. Shakes were usually nailed to spaced boards with gaps between them, which the Cedar Shake and Shingle Bureau allows for wood. IKO's installation guide calls for a deck that is smooth and free of gaps. So we tear the shakes off and add solid sheathing (plywood or OSB sheets that form the roof deck) before the new roof goes on.

Do I need a permit to replace my roof?

It depends on the municipality and the job. Central Saanich's residential guide lists replacing roofing material as work that needs no permit. Saanich says you need a permit to alter an existing building without naming re-roofing either way, and a heritage-designated home in Victoria cannot be altered without Council approval. Structural work or a change of material can need a permit anywhere. We confirm with your building department before work starts.

Is moss bad for my roof?

Over time, yes. Oregon State University's guidance says moss slows water flow off a roof and can damage shingles, and that pressure washing damages shingles too. We don't remove moss or clean roofs. When we replace a roof, shade and moss are part of the materials conversation, because metal gives moss very little to grip.

What areas do you serve?

Greater Victoria on the South Island: Victoria, Saanich, Oak Bay, Esquimalt, View Royal, Langford, Colwood, Metchosin, Sooke, Central Saanich, North Saanich and Sidney. We don't work up-Island or on the Gulf Islands. Pick your municipality on the quote form and we reply within one business day. Local notes are on our service areas page.

Sources

Figures are dated ranges from these sources, not quotes. Checked November 2026.

  1. Environment and Climate Change Canada: Canadian Climate Normals 1981-2010, Victoria Int'l A (climate ID 1018620)
  2. Environment and Climate Change Canada: Canadian Climate Normals 1981-2010, Metchosin (climate ID 1015105), total precipitation
  3. Shoreline Roofing: How Much Does a New Roof Cost in Victoria, BC in 2026?
  4. Shoreline Roofing: Is Metal Roofing Worth It in Victoria? A Straight Answer
  5. Forge Metal Roofing: Roof Replacement Cost Victoria BC 2026 Pricing Guide
  6. Forge Metal Roofing: How Long Does It Take to Replace a Roof?
  7. InterNACHI: Standard Estimated Life Expectancy Chart for Homes
  8. Cedar Shake & Shingle Bureau: General Design and Application Details
  9. IKO: How to Install Asphalt Shingles
  10. District of Central Saanich: Residential Building Permit Guide
  11. District of Saanich: Q & A for Permits
  12. City of Victoria: Heritage Conservation
  13. Oregon State University Extension: Moss on Roofs and Walkways
  14. RDH Building Engineering (RCI 2015): The Problems With and Solutions for Ventilated Attics
  15. WorkSafeBC: Homeowners, who needs coverage

Request a written roofing quote

Tell us where the house is and what the roof is doing. We reply within one business day to arrange a look, then send the scope and price in writing.

  • Repair offered first when a repair will do
  • Every line of the price in writing
  • Nothing booked until you say so

We reply by email within one business day. No booking until you say so.

Get a written roofing quote